Hafa is responsible for setting project schedules, identifying safety hazards, solving quality control problems and budget overruns.
We take all necessary measures to address or modify the existing conditions or characteristics of a construction site.

Site Intervention

Site Intervention involves making changes or improvements to the site to accommodate the construction activities, ensure safety, mitigate risks, and optimize project execution.

Site intervention can encompass a range of actions depending on the specific project requirements and site conditions. Some common examples include:

Site Preparation

This involves clearing the land, removing obstacles, and preparing the site for construction activities. It may include activities such as demolition, excavation, grading, and leveling.

Infrastructure Modification

Site intervention may involve modifying or installing new infrastructure elements to support the construction project. This can include utilities like water supply lines, electrical connections, drainage systems, or road access.

Temporary Works

Temporary structures or installations are often required during construction. Site intervention may include the construction of temporary facilities such as site offices, storage areas, worker accommodations, fencing, or scaffolding.

Environmental Mitigation

Construction projects must often comply with environmental regulations and mitigate potential impacts. Site intervention may involve implementing measures to protect natural resources, manage stormwater runoff, prevent erosion, or control dust and noise pollution.

Safety Measures

Site intervention includes implementing safety protocols and measures to ensure the well-being of workers and the public. This can involve installing safety barriers, signage, personal protective equipment (PPE) requirements, and establishing emergency response plans.

Access and Logistics

Site intervention may include establishing temporary access routes, creating designated areas for deliveries and storage, and optimizing the logistics flow to ensure the smooth operation of the construction site.